Certificate of completion for work & construction — free templates

A certificate of completion is the one-page sign-off that says the job is done, records any small open items, starts the warranty, and backs up your final invoice. Get it signed at the final walkthrough while the client is standing in the finished space, not by email a week later. List open items with a date to finish them, rather than holding the whole sign-off for one missing cover plate, and put the warranty start date on the certificate so nobody argues later about when the clock started. A copy goes with the final invoice.

Samples only, not legal advice. If your contract, lender or insurer requires a specific completion form, use that form. A certificate of completion is not a lien waiver or a recorded notice of completion.

On this page

What a certificate of completion for work should say

A certificate of completion is a one-page record, signed by you and the client, that says the work in the contract is finished, or finished except for a short list of items. It is how you close a job cleanly: it sets the date the warranty starts, it supports your final invoice, and it settles the question of what was done before anyone remembers it differently.

Include: both parties and the job address; the contract or estimate it refers to, by date or number, plus any change orders; a plain description of the work completed; the completion date and, if relevant, the final walkthrough and inspection dates; any open items with who will finish them and by when; the warranty start date and length; where payment stands (contract total, paid to date, balance due); and signatures and dates.

Keep it factual. Don’t write “all work meets every code” unless an inspector has signed off; write “final inspection passed on [date], permit #[__]” or leave it out. Samples only, not legal advice.

Substantial vs. final completion, and what signing can trigger

Substantial completion usually means the client can use the space or system for its purpose while a few minor items stay open. Final completion means everything, including the punch list, is done. Larger contracts often treat these as two separate milestones, each with its own payment, and some lenders and owners require their own forms (the AIA forms used on many commercial projects, for example). If your contract names a form, use that one, not a template.

Signing can matter beyond the paperwork. Depending on your contract, it may start the warranty clock, release retainage, or make the final payment due. In some states, a separate notice of completion, often recorded with the county, can shorten deadlines for lien claims. That is a different legal document from the certificate on this page. If liens or retainage are in play, check your state’s rules or ask a local attorney before you rely on a date. If the final payment is still unpaid after the client has signed off on the completed work, the signed certificate is your best exhibit; the next step is a calm written payment demand letter with the exact amount, the signed date and a deadline. In California, an owner who withholds retention on a private job must pay it within 45 days after completion of the work of improvement (Civil Code 8812); the retention calculator dates it and checks the 5% cap that applies to many contracts entered into in 2026 or later.

A completion certificate is not a lien waiver and not a receipt. Once you’re paid, the client or lender may also ask for a lien waiver, and you should send a receipt.

Where the certificate fits in the job closeout

A clean closeout runs in this order: final walkthrough with the client, using the punch list; finish the items or write them down; pass any required final inspection; sign the certificate of completion; send the final invoice; collect payment; hand over warranty papers, manuals and codes; and send a receipt and, if asked, a lien waiver. Then follow up a week later.

The most common mistake is sending the final invoice before the client has agreed the work is done. A client who hasn’t signed off has a reason to hold payment. A client who signed a certificate listing two small open items usually pays the balance minus a fair holdback for those items.

Second most common: letting a tiny item block the whole sign-off. List it as an exception with a date and an amount held back, and get the rest signed.

Certificate of completion templates

Copy, fill in the brackets, print or send for e-signature.

Basic certificate of completion for work

Fits most small jobs.

CERTIFICATE OF COMPLETION

Contractor: [Business name], [license # if applicable], [phone]
Client: [Client name]
Job address: [Address]
Agreement: [Estimate / contract] #[__] dated [date], including change orders #[__]

Work completed: [Replaced kitchen faucet and supply lines; repaired drywall around sink; painted patched area.]

Completion date: [date]

The client confirms the work described above has been completed [with no exceptions / except the items listed on the attached sheet].

Warranty: [1 year] on workmanship, starting on the completion date.
Contract total: $[__]   Paid to date: $[__]   Balance due: $[__] by [date]

Contractor signature / date: ____________________
Client signature / date: ____________________

Construction or remodel certificate of completion

For multi-week projects with permits.

CERTIFICATE OF COMPLETION — [Bathroom remodel]

Owner: [Name]          Contractor: [Business name], License #[__]
Project address: [Address]
Contract dated [date]; change orders #1-#[3] (total $[__])
Permit #[__]; final inspection [passed on (date) / not required for this scope]

Scope completed: [Demolition, new shower pan and tile, vanity, toilet, lighting, exhaust fan, paint, trim.]

Final walkthrough held on [date] with [names present].
Open items (see attached list): [none / 2 items, to be finished by (date)]

Workmanship warranty: [__] months from [date]. Manufacturer warranties and manuals handed over: [yes].

Contract sum incl. change orders: $[__]
Paid to date: $[__]
Held for open items: $[__]
Balance due on signing: $[__]

Owner: __________________  Date: ______
Contractor: ______________  Date: ______

Certificate of substantial completion (simple version)

When the client can use it, but a few items remain.

CERTIFICATE OF SUBSTANTIAL COMPLETION

Project: [Name / address]
Contract: [date / #]
Date of substantial completion: [date]

The work is complete enough for the owner to use [the space / the system] for its intended purpose. The items on the attached list remain to be completed or corrected. The contractor will finish them by [date].

Responsibilities from this date: [utilities, security, insurance and maintenance of the completed area pass to the owner]. Warranty begins [on this date / on final completion] [per the contract].

This certificate does not waive the owner's right to have the listed items finished, or claims for defects that weren't visible at the walkthrough.

Owner: __________ Date: ____   Contractor: __________ Date: ____
[If your contract specifies a form, such as an AIA form, use that form instead.]

Final completion and acceptance certificate

After the punch list is closed.

CERTIFICATE OF FINAL COMPLETION AND ACCEPTANCE

Project: [address]   Contract: [#/date]
Substantial completion: [date]   Final completion: [date]

All work under the contract and change orders #[__] has been completed, including every item on the punch list dated [date]. The owner accepts the work as complete.

Final contract amount: $[__]. Final payment of $[__] [including released retainage of $(__)] is due [on signing / within (10) days].

Closeout documents delivered: warranties, manuals, as-built notes, keys/codes, [final lien waivers on payment].

Owner: __________ Date: ____   Contractor: __________ Date: ____

Service or repair job completion form

For one-visit service calls.

JOB COMPLETION FORM — Work Order #[__]

Date: [date]   Technician: [name]
Customer: [name]   Address: [address]
Problem reported: [No heat upstairs]
Work performed: [Replaced failed igniter; cleaned flame sensor; tested system through 3 heat cycles.]
Parts used: [igniter (part #)]
System left: [operating normally]
Recommendations: [Replace filter within 30 days.]

Customer: I confirm the work above was completed today.
Signature: ______________   Date: ______
Parts warranty: [__]; labor warranty: [__] days.

Commercial or tenant improvement completion certificate

For property managers and landlords.

CERTIFICATE OF COMPLETION — Tenant Improvement

Property: [Building, suite #]
Owner/Manager: [Company]   Tenant: [Company]
Contractor: [Business name]
Work: [Partition walls, doors, lighting, paint and carpet for Suite 200 per drawings dated (date)]
Certificate of occupancy / final inspection: [date / permit #]
Completion date: [date]
Exceptions: [none / list attached]

The undersigned confirm the work is complete and the space was turned over to [tenant] on [date].
Owner/Manager: __________ Tenant: __________ Contractor: __________

Subcontractor completion certificate to a general contractor

Sub to GC, before final payment.

SUBCONTRACTOR CERTIFICATE OF COMPLETION

To: [General contractor]
From: [Subcontractor business name]
Project: [Name / address]
Subcontract: [#/date], change orders #[__]

[Subcontractor] confirms that all [electrical rough-in and trim] work under the subcontract was completed on [date]. Inspections: [rough passed (date); final passed (date)].

Subcontract amount: $[__]; paid to date: $[__]; balance including retainage: $[__].
[A conditional final lien waiver is attached and becomes effective on receipt of payment.]

Subcontractor: __________ Date: ____
Received by GC: __________ Date: ____

Certificate of completion for insurance repair work

Insurers often have their own form; use theirs if they do.

CERTIFICATE OF COMPLETION — Insurance Repair

Policyholder: [name]   Claim #: [__]   Insurer: [company]
Property: [address]   Date of loss: [date]
Contractor: [Business name]

Repairs completed per the approved estimate dated [date] [and supplement #(__)]: [Replaced 12 sq of roofing, drip edge and 2 vents; repaired ceiling drywall in bedroom 2.]
Completion date: [date]

The policyholder confirms the repairs listed above were completed. Signing does not affect the policyholder's rights under the policy.

Policyholder: __________ Date: ____   Contractor: __________ Date: ____
[If the insurer or mortgage company requires its own completion form, use that form instead.]

Work completed descriptions by trade

Paste into the “work completed” line. Specific beats vague.

Roofing

Squares, materials, and what was replaced.

Work completed: Removed existing roofing down to the deck on the main roof (approx. [24] squares). Replaced [3] sheets of damaged decking. Installed ice-and-water shield at eaves and valleys, synthetic underlayment, new drip edge, [architectural shingles, color], ridge vent and [2] pipe boots. Cleaned up debris and ran a magnet sweep over the yard and driveway. Manufacturer warranty registration: [submitted / to client].

HVAC installation

Equipment, model numbers, startup.

Work completed: Removed old furnace and AC. Installed [brand] [__] BTU furnace (model [__], serial [__]) and [__]-ton condenser (model [__], serial [__]), new coil, line set, pad, disconnect and thermostat. Startup and test completed on [date]; temperature split [__]°F. Permit #[__]: [final inspection date]. Equipment registered for warranty on [date].

Plumbing

Fixtures and tests.

Work completed: Replaced [40]-gallon gas water heater with [50]-gallon (model [__]), new expansion tank, gas flex line, and T&P discharge line. Checked for gas leaks and tested water temperature at [120]°F at the kitchen tap. Old heater hauled away. Permit #[__]: [inspection date / pending].

Electrical

Circuits, panel, inspection.

Work completed: Installed [2] new 20-amp kitchen circuits and [4] GFCI-protected receptacles, [6] recessed LED lights on a dimmer, and replaced [1] breaker in the main panel. Panel directory updated. Permit #[__], final inspection passed on [date]. [Note: work limited to the circuits listed; the rest of the home's wiring was not inspected.]

Interior painting

Rooms, coats, products.

Work completed: Painted walls in living room, hallway and [2] bedrooms ([2] coats, [brand / color / finish]), ceilings in the same rooms ([1] coat, flat white), and trim and doors ([semi-gloss]). Patched nail holes and minor cracks before painting. Furniture moved back; touch-up paint labeled and left in [garage].

Flooring

Square footage and transitions.

Work completed: Removed carpet and pad in [3] bedrooms. Installed [__] sq ft of [luxury vinyl plank, brand/color] over [underlayment], new baseboard/quarter round, and [3] transitions. Doors trimmed as needed. Leftover planks ([1] box) left with the client for future repairs.

Landscaping installation

Plants, irrigation, warranty terms.

Work completed: Installed [12] shrubs, [2] trees ([species, size]), [6] yards of mulch, and [40] ft of steel edging in the front beds. Added [2] drip irrigation zones on the existing controller, set to the watering schedule left with the client. Plant warranty: [1 year] with proper watering, as described in the care sheet.

Post-construction or move-out cleaning

Rooms and areas included.

Work completed: Post-construction cleaning of [entire home / Suite 200]: dust removal from all surfaces, vents and light fixtures; inside cabinets and drawers; windows inside [and tracks]; appliance exteriors [and interiors]; bathrooms and fixtures; floors vacuumed and mopped. Excluded: exterior windows, carpet shampooing. Walkthrough with [name] on [date].

Clauses to add to a certificate

Choose the ones that fit your contract.

Acceptance with exceptions

The workhorse clause.

The client accepts the work described above as complete, except for the items listed on the attached exception list. The contractor will complete those items by [date]. $[__] of the final payment may be held until they're finished, after which it is due within [5] days.

Warranty start date

Remove all doubt about when the clock starts.

The contractor's workmanship warranty of [12] months begins on [the completion date above / the date of final completion]. Manufacturer warranties are separate and follow the manufacturer's terms.

Hidden defects not waived

Fair to the client; builds trust.

Signing this certificate confirms the work appeared complete at the final walkthrough. It does not waive warranty claims for defects that weren't reasonably visible at that time.

Final payment reference

Ties the signature to the money.

Final payment of $[__] is due [on signing / within 10 days of this certificate], as set out in the agreement dated [date]. [Retainage of $(__) is released with this payment.]

Inspection and permit status

State facts only.

Permit #[__] for this work: final inspection [passed on (date) / scheduled for (date) / not required for this scope]. The contractor will provide a copy of the inspection record on request.

Photos and records

Attach evidence.

Attached: [8] photos of the completed work taken on [date], the signed punch list dated [date], and the equipment/model list.

Owner responsibilities after completion

For cure times and care.

From the completion date, the owner is responsible for normal care and maintenance as described in the attached care sheet, including [no heavy traffic on new floors for 24 hours / watering new plants / changing filters].

Response window

Use only if your contract allows it.

If the client believes any work is incomplete, the client agrees to tell the contractor in writing within [7] days of receiving this certificate, listing the items, so they can be addressed. [Only include a deadline like this if it matches your contract; ask a local attorney if unsure.]

Messages to get the certificate signed

Text and email wording.

Email sending the certificate for signature

After the walkthrough.

Subject: [Address] — certificate of completion for your signature

Hi [Client name],

Thanks for walking through the job with me today. Attached is the certificate of completion for [the bathroom remodel]. It lists the work, the two small items we agreed I'll finish by [Friday], and your [12-month] workmanship warranty starting today.

Please look it over and sign [here: link / and send me a photo]. Once it's signed I'll send the final invoice for $[__], which already holds back $[__] for those two items.

[Your name], [Business name]

Short text version

For small jobs.

Hi [Client name], all done at [address]! I just sent a one-page completion form to your email. It lists what we did and your warranty dates. A quick signature when you have a minute, and I'll send the final bill. Thanks!

Reminder when it’s still unsigned

Polite, specific.

Hi [Client name], just checking on the completion certificate I sent [Tuesday]. If anything on it doesn't match what you saw, tell me and I'll fix it or come back. Otherwise, a signature lets me close the job and start your warranty. Thanks!

Client asks “what am I signing?”

Plain explanation.

Good question. It confirms that the work we listed is finished (except the two items noted), records the date your warranty starts, and shows the balance left. It doesn't give up your right to call me if something shows up later; the warranty still covers that. Happy to go over it by phone.

Client wants to wait until a small item is done

Sign with an exception instead.

Totally fair. How about this: we list the [cabinet door adjustment] as an open item with a date, hold back $[150] until it's done, and sign for everything else today. That way your warranty starts now and you're not paying for anything that isn't finished.

Returning the countersigned copy

Close the loop.

Thanks for signing! Here's your countersigned copy of the certificate of completion, plus your warranty card and the manuals for [the fan and vanity light]. Keep these with your home records. The final invoice is attached.

GC asking a sub for the completion certificate

Office-to-office.

Hi [Name], we're closing out [project] this week. Please send your completion certificate for [scope] with inspection dates, your final invoice, and a conditional final lien waiver. We'll release your balance [and retainage] within [__] days of receiving all three. Thanks for the good work on this one.

Handover message with closeout documents

The last email of the job.

Hi [Client name], everything for your [roof] in one place:
1) signed certificate of completion
2) manufacturer warranty registration #[__]
3) our workmanship warranty ([10] years)
4) photos before and after
5) paid receipt
If you sell the home, the warranty [is transferable; call us]. Thank you for choosing us.

When sign-off gets complicated

Phased jobs, disputes, lenders and remote clients.

Partial completion certificate for a phase

For milestone billing.

PHASE COMPLETION CERTIFICATE — Phase [2] of [3]

Project: [address]   Contract: [date]
Phase [2]: [framing, windows and exterior doors]
Phase completed on: [date]   Inspection: [framing passed (date)]
Milestone payment due: $[__] per the payment schedule.

Signing confirms Phase [2] is complete. It does not accept work in other phases.
Owner: ________ Contractor: ________

Client disputes that the job is finished

Get specifics, offer a walkthrough.

Hi [Client name], I hear you that you don't feel the job is finished, and I want to fix that. Could you list the items you're seeing, or should I come by [Thursday at 9]? We'll go room by room, write down anything that needs work, and I'll give you a date for each item. I'd rather get it right than rush the paperwork.

Lender or draw inspector needs a completion certificate

For construction loans and HELOCs.

Hi [Name], for the [final draw], the lender needs a signed completion certificate, the final inspection record and photos. I've attached all three, plus our final invoice. If the lender uses its own completion form, please send it and I'll fill it out today.

Remote client: e-signature

When the owner doesn’t live there.

Hi [Client name], since you're out of town, I've sent the certificate of completion through [e-signature tool] along with [24] photos and a short walkthrough video of each room. If anything looks off, tell me and I'll fix it before you sign. [Your property manager, (name), also walked the job on (date).]

Property manager signing for an owner

Confirm who can sign.

Hi [Name], before you sign the completion certificate for [unit 4B], can you confirm you're authorized to sign for [owner/LLC] on this work order? If the owner needs to sign, I'll send it to them directly. Either way, I've attached photos and the work order.

Completion with exceptions summary

The attachment page.

EXCEPTION LIST — attached to the Certificate of Completion dated [date]

1. [Adjust pantry door so it closes flush]: contractor, by [date], $[50] held
2. [Replace cracked outlet cover in hall]: contractor, by [date], $[10] held
3. [Touch up paint behind the bathroom door]: contractor, by [date], $[40] held

Total held: $[100]. Due within [5] days after all items are complete.
Owner initials: ____ Contractor initials: ____

Closeout checklists

Use before and after signing.

Before you ask for a signature

Quick contractor checklist.

☐ Walked the job alone first with the punch list
☐ Cleaned up: debris, dust, tape, labels, leftover materials stored or removed
☐ Tested everything (water, power, controls, doors, drains)
☐ Final inspection passed or scheduled (if required)
☐ Photos of finished work taken
☐ Change orders all signed and added up
☐ Balance and any holdback calculated
☐ Walkthrough booked with the client

Closeout packet for the client

Hand over with the certificate.

☐ Signed certificate of completion
☐ Exception list (if any) with dates
☐ Workmanship warranty letter
☐ Manufacturer warranties, registration numbers, manuals
☐ Paint colors / product names / leftover materials list
☐ Keys, codes, remotes
☐ Care and maintenance sheet
☐ Final invoice and, once paid, receipt [and lien waiver if requested]

Photo checklist for proof of completion

What to photograph.

☐ Wide shot of each room or area from the doorway
☐ Close-ups of the main work (tile lines, joints, connections)
☐ Labels: model/serial plates, panel directory, shutoff valves
☐ Inside walls before closing up (if any)
☐ The site clean at departure
☐ Any pre-existing damage you didn't cause, noted on the form
Name the files with the date and address.

Internal QC sign-off before the walkthrough

For crews with a lead.

QC SIGN-OFF — [address] — [date]
Lead: [name]
☐ Scope matches work order + change orders
☐ Punch list items closed: [__] of [__]
☐ Tools and materials removed
☐ Client areas protected/cleaned
☐ Issues to tell the client about: ______
Lead signature: ______ Owner review: ______

Record-keeping note

What to file and for how long.

File for each job: contract, change orders, certificate of completion, exception list, inspection records, photos, invoices, payments, lien waivers and warranty letter. Keep them at least as long as your longest warranty, and longer if your accountant or state rules say so.

Next-season follow-up reminder

Turn a finished job into the next one.

Calendar reminder: [6 months] after the completion date, text [client]: "Hi [name], it's been six months since we finished your [deck]. How's it holding up? If you'd like, I can do a free check and reseal quote before winter."

Certificate of completion in Spanish

Certificado de terminación de obra.

Certificado de terminación de obra

Versión básica.

CERTIFICADO DE TERMINACIÓN DE OBRA

Contratista: [Nombre del negocio]
Cliente: [Nombre]
Dirección de la obra: [Dirección]
Contrato o presupuesto: #[__] del [fecha]

Trabajo terminado: [Descripción]
Fecha de terminación: [fecha]

El cliente confirma que el trabajo descrito fue terminado [sin excepciones / excepto lo que aparece en la lista adjunta].
Garantía de mano de obra: [1 año] a partir de la fecha de terminación.
Total: $[__]  Pagado: $[__]  Saldo: $[__]

Firma del contratista / fecha: __________
Firma del cliente / fecha: __________

Texto para pedir la firma

Corto y amable.

Hola [Nombre], ¡terminamos en [dirección]! Le envié por correo un formulario de una página con lo que hicimos y las fechas de su garantía. Cuando pueda, fírmelo y le mando la factura final. ¡Gracias!

Cláusula de excepciones

Para dejar pendientes pequeños.

El cliente acepta el trabajo como terminado, excepto los puntos de la lista adjunta. El contratista los terminará antes del [fecha]. Se pueden retener $[__] del pago final hasta que estén terminados.

Cuando el cliente pregunta qué firma

Explicación sencilla.

Buena pregunta. Confirma que el trabajo de la lista está terminado (menos los dos detalles anotados), marca la fecha en que empieza su garantía y muestra el saldo. No renuncia a llamarme si algo aparece después; la garantía lo cubre.

Recordatorio sin firmar

Sin presión.

Hola [Nombre], le escribo por el certificado de terminación que le mandé el [martes]. Si algo no coincide con lo que vio, dígame y lo corrijo o regreso. Si está bien, con su firma cierro el trabajo y empieza su garantía.

Entrega de documentos

Último mensaje del trabajo.

Hola [Nombre], le mando todo junto: el certificado firmado, la garantía del fabricante, nuestra garantía de mano de obra, fotos de antes y después, y su recibo pagado. Guárdelos con los papeles de su casa. ¡Gracias por confiar en nosotros!

Writing a “work completed” line that holds up later

The description is the part people argue about months later, so write it the way an inspector would read it. Use quantities (square feet, squares, linear feet, number of fixtures), products (brand, model, color), locations (which rooms, which side of the house), and tests you ran. “Fixed bathroom” protects no one; “replaced wax ring and closet bolts on hall-bath toilet, reset and caulked base, tested with 5 flushes, no leaks” settles questions.

Say what was not included when it’s likely to come up: “exterior trim not painted,” “existing wiring outside the kitchen not inspected,” “grading by others.” Note pre-existing conditions you saw but didn’t touch. That one line can save a warranty dispute.

Match the words to the contract and change orders. If the estimate said “up to 3 sheets of decking” and you replaced 5 under a signed change order, say so and reference the change order number.

More work completed descriptions by trade

Edit quantities and products.

Concrete driveway or patio

Thickness, reinforcement, cure.

Work completed: Removed existing [asphalt] driveway (approx. [600] sq ft). Graded and compacted [4] in. of base. Poured [4]-in. concrete with [rebar / wire mesh], broom finish, control joints every [10] ft, and expansion joint at the garage slab. Curing instructions left with client: no cars for [7] days, no deicing salt the first winter.

Fence installation

Length, materials, gates, property line note.

Work completed: Installed [150] linear ft of [6-ft cedar privacy] fence with [4x4 posts set in concrete every 8 ft] and [1] [4-ft] walk gate with latch. Fence placed per the line the owner marked on [date]. [Utility locate ticket #(__) completed before digging.] Property line location is the owner's responsibility.

Deck build or repair

Structure, fasteners, finish.

Work completed: Built [12x16] ft deck with [pressure-treated] framing, [composite decking, color], [3]-step stair and [__] ft of railing. Ledger attached with [lag screws / structural screws] and flashing. Permit #[__], final inspection [passed (date)]. Composite manufacturer warranty info handed over.

Window or door installation

Units, sizes, sealing.

Work completed: Removed and replaced [8] windows ([brand, series], sizes per order #[__]) and [1] entry door. Insulated gaps with [low-expansion foam], installed new interior casing, caulked exterior. All units operate and lock. Manufacturer warranty registration [submitted on (date)]. Old units hauled away.

Handyman multi-task visit

A list of small items.

Work completed ([3.5] hours):
1. Hung [3] pictures and [1] mirror (living room)
2. Replaced [2] interior door handles (bedrooms)
3. Re-caulked tub surround (hall bath)
4. Patched [2] drywall holes, primed (hallway; paint by owner)
5. Replaced smoke detector battery (upstairs)
Not done: [garage door opener; needs a part, quoted separately].

Garage door or appliance installation

Model, safety tests.

Work completed: Installed [16x7] [brand/model] garage door with new tracks, springs and [belt-drive] opener (model [__]). Tested auto-reverse and photo-eye safety features; balanced springs; programmed [2] remotes and keypad. Old door and opener hauled away.

Completion letters and experience certificates

Letter-format versions, plus asking a client for one.

Project completion letter to the client

For people who prefer a letter to a form.

[Date]

Dear [Client name],

I'm writing to confirm that we completed the [kitchen remodel] at [address] on [date], as described in our agreement dated [date] and change orders #1-#[2]. We walked through the finished work together on [date], and [there are no open items / the two open items listed below will be finished by (date)].

Your workmanship warranty runs for [12] months from [date]. The final balance of $[__] is due by [date]; the invoice is enclosed.

Thank you for trusting us with your home. Please sign below to confirm, and keep a copy for your records.

Sincerely,
[Name], [Business name]

Accepted: __________________ Date: ______

Completion notice to a building or property manager

Short, factual.

Subject: [Unit 4B] — work order #[__] completed

Hi [Name],

Work order #[__] at [property, unit] was completed on [date]: [replaced bathroom exhaust fan, patched and painted ceiling, tested fan on its switch]. Photos are attached. The unit was locked and the key returned to [lockbox / office] at [time].

The completion form is attached for your signature, and the invoice will follow.

[Name], [Business name]

Make-ready / unit turnover completion

For landlords between tenants.

UNIT TURNOVER COMPLETION — [Property, unit] — [date]
☑ Full paint ([color]), ceilings touched up
☑ Carpet cleaned / [LVP replaced in kitchen]
☑ Deep clean incl. appliances inside
☑ Smoke/CO detectors tested
☑ Blinds replaced: [2]
☑ Keys re-cut / locks rekeyed: [yes]
Ready for showing: [date]. Exceptions: [dishwasher needs a part (ordered)]
Signed: [Contractor] ______  [Manager] ______

HOA common-area work completion

For board approval and records.

CERTIFICATE OF COMPLETION — [Community name] HOA

Work: [Repaired and sealed 2,400 sq ft of asphalt in the north lot; restriped 38 spaces]
Approved by the board on: [date]   Contract amount: $[__]
Completed: [date]   Photos and the product data sheet attached.

Board representative: __________ Date: ____
Contractor: __________ Date: ____

Work experience certificate a client gives a contractor

For bids that ask for proof of past work.

[Client letterhead]
[Date]

To whom it may concern,

This is to certify that [Contractor business name] completed [the renovation of our 3,000 sq ft office, including partitions, electrical and finishes] at [address] under our agreement dated [date]. The work started on [date] and was completed on [date]. The contract value was approximately $[__].

[The work was completed on schedule and to our satisfaction.]

[Name], [Title], [Company]
[Phone / email]

Asking a client for a completion letter or reference

Good for your portfolio and bids.

Hi [Client name], thanks again for signing off on the [office renovation]. I'm bidding on a few similar projects, and some ask for a letter from a past client confirming the work. Would you be willing to sign a short one? I can send a draft with just the facts (scope, dates, value) for you to edit, so it takes two minutes. No pressure at all.

After the certificate is signed

Money, holdbacks, warranty and the relationship.

Final invoice email referencing the certificate

So payment follows the signature.

Subject: Final invoice — [address] (signed completion attached)

Hi [Client name],

Thanks for signing the certificate of completion. Attached is the final invoice for $[__], which reflects the contract total, change orders #1-#[2], payments received and the $[__] held back for the two open items. Payment is due by [date]; you can pay by [methods].

[Name]

Holdback release request after open items are done

Close the exceptions in writing.

Hi [Client name], the two open items from the certificate are done: the pantry door now closes flush and the hall outlet cover is replaced (photos attached). That releases the $[100] holdback. I've attached a short invoice for it. Thanks for your patience!

Retainage release request

For commercial or GC jobs.

Hi [Name], final completion on [project] was signed on [date], and all closeout documents (warranties, O&M manuals, as-builts and final lien waivers on payment) were delivered on [date]. Per the [subcontract / contract], please release the [5]% retainage of $[__]. Our invoice is attached. Let me know if anything else is needed.

Warranty start confirmation

A short note they’ll keep.

Hi [Client name], for your records: your workmanship warranty on the [roof] started on [date] (the completion date on our certificate) and runs through [date]. If you notice anything at all, text this number with a photo and we'll come take a look.

Thank-you and review ask after sign-off

Ask once, offer the same link to everyone.

Thank you for choosing us for your [deck]! If you were happy with the work, a short review helps other homeowners find us: [link]. And if anything isn't right, tell me first so I can fix it.

30-day check-in

Catch small issues early.

Hi [Client name], it's been about a month since we finished your [bathroom]. Everything holding up? Any caulk gaps, sticky doors or drips? Small adjustments in the first months are covered, so just send a photo if you see anything.

A closeout with dates and dollars: substantial completion to final payment

The certificate is easier to sign when everyone can see what it starts. Worked example: a $28,400 kitchen remodel contract holds back 5% retainage, $1,420, until final completion. The client signs a certificate of substantial completion on Friday, Dec 11, 2026 with seven punch-list items attached. The contract says punch items are finished within 10 business days, so with Dec 25 off, the deadline is Monday, Dec 28. The one-year workmanship warranty in this contract runs from substantial completion, so it ends Dec 11, 2027, and the certificate should say that date in words, not leave it to be worked out later. Once the last item is checked off, the contractor issues a final certificate, sends the final invoice for the $1,420 plus any approved change orders, and includes a conditional final lien waiver with it.

Write those dates and amounts into the certificate or its cover note: the substantial completion date, the punch-list deadline, the warranty start and end, the retainage amount and when it is due under the contract, and who to contact for a warranty call. When the contract is silent on any of them, agree on it in writing before signing rather than after. Keep a copy of both certificates, the punch list with the date each item was finished, the photos, and the lien waivers together in the job file. Retainage, warranty and lien rules come from your contract and your state’s law, so the 5%, the 10 business days and the one-year warranty here are illustrations, not standards.

How a recorded notice of completion shortens lien deadlines in California and Nevada

The certificate on this page is a private record between you and the client. A notice of completion is different: the owner records it with the county, and once it is recorded, everyone’s time to record a mechanics lien gets shorter. The date of completion your client signs on the certificate is usually the date that ends up on the notice, so it pays to know what it starts.

Worked example (illustrative dates): a bathroom remodel is finished on Friday, March 12, 2027, and the owner signs the certificate of completion that day. On Wednesday, March 17 (within California’s 15 days), the owner records a notice of completion.

What to do with this: when a client signs your certificate, put the 30-, 40- and 60-day dates on your calendar until the final payment clears, and if you’re a sub, ask the general contractor whether the owner plans to record a notice. Getting paid first and then sending an unconditional final waiver (see Nevada and California lien waiver rules) is still the normal end of a job; the deadlines matter when the last check doesn’t come. Lien law is technical, with notice requirements earlier in the job too; this is general information, not legal advice.

Completion certificate questions: who signs, lien waivers and notices of completion

Who signs a certificate of completion? Usually the contractor and the client (owner). On larger jobs, an architect, property manager, lender inspector or general contractor may sign too. Make sure whoever signs is authorized to accept the work.

Is a certificate of completion the same as a lien waiver? No. The certificate confirms the work is finished. A lien waiver gives up lien rights, usually in exchange for payment. They often travel together at closeout, but they are different documents.

Is it the same as a notice of completion? No. In some states, a notice of completion is a separate document, often recorded with the county, that can affect lien deadlines. Check your state’s rules if that applies to your job.

What if the client won’t sign? Ask for specific items, offer a walkthrough, and list anything reasonable as an exception with a holdback. If you still disagree, follow the dispute steps in your contract.

Do small jobs need one? A one-visit repair can use a short job completion form or a signed work order. For anything with a deposit, a warranty, or a balance due, a one-page certificate is worth the two minutes.

Is this legal advice? No. These are samples. If your contract names a specific form, or liens or retainage are involved, use the required form and check your state’s rules.

Fill it in right after the final walkthrough

After the final walkthrough, pick the certificate that fits the job, paste in a specific “work completed” description from the trade section, add the clauses you need (exceptions, warranty start, hidden defects), and attach photos and the exception list. Send it with the email or text above, get both signatures, then send the final invoice and the closeout packet.