Parts ordered & project delay messages — waiting on parts and start date delayed (texts, emails & a letter)
A delay is rarely what upsets a client. Finding out late, or not knowing the new date, is. Whether the parts are ordered and on the way or the start date has slipped, the fix is the same: tell them early and give a date. Send the notice as soon as you know the date will move, give the real reason in one line, and give a new date you can keep — even if it’s later than you’d like. A second delay hurts much more than a longer first one, so pad the estimate and update the client before they have to ask.
Swap in the real new start date and your client’s name; the samples are placeholders. Only give a new date you can actually hold, and only quote a supplier or part ETA you’ve been given.
As soon as you know the date will slip — not the night before. If you learn on Monday that Thursday won’t happen, Monday is when they should hear it.
Before the job starts: the first day, kickoff, or first visit moves. Use the new start date and by reason sections.
In the middle of a job when you’re waiting on a part, a special order, or materials. Use waiting on parts.
When an earlier delay gets longer. A second notice is better than letting the first date pass in silence — see a second delay.
Not for today’s visit being called off — that’s Can’t make it today. Not for moving a routine weekly slot — that’s Reschedule. Weather calls have their own page: Weather delays.
What to include in a project delay message
The plain fact: “I need to push our start date” or “we’re paused until the part arrives.” First line, not buried after small talk.
One short reason. Materials, a permit, the job before yours ran long. One sentence is enough; a long story sounds like an excuse.
The new date or the next step: a real day, two choices, or “I’ll confirm by Friday.” A delay with no next step reads like you’ve walked away.
What doesn’t change: the price, the scope, their spot in your schedule. Clients often worry about these more than the date.
What they need to do, if anything — move furniture later, keep the dog home a different day, nothing at all.
A brief apology when the delay is on your side. One “sorry for the change” is enough; three sound anxious.
Mistakes that make a delay worse
Waiting until the morning of. They took the day off, moved the car, cleared the room. Tell them the moment you know.
Guessing an ETA. “Should be here Tuesday” becomes a broken promise if the supplier never said Tuesday. “I don’t have a firm date yet; I’ll update you Friday” is honest.
Going quiet during a long wait. Even a “no news yet, still on order” text every week keeps trust.
Blaming the client’s choice. If the special-order tile is backordered, say so without making them feel guilty for choosing it.
Changing the price in the same message without warning. If a delay does affect cost, explain it separately and get a yes — see Extra materials cost.
Booking another job into their slot and hoping they won’t notice. If you can’t hold the date, say so.
Example: a backordered vanity pushes a bathroom start two weeks
Jordan, a one-person remodeler, is set to start a bathroom on Monday. On the Wednesday before, the supplier says the vanity is backordered two weeks. Jordan could start demolition anyway, but the bathroom would sit unusable for two weeks.
Jordan texts that afternoon: “Hi Alex — the vanity you picked is backordered; the supplier now says it ships around the 16th. I don’t want to tear out your only shower and leave it for two weeks, so I’d like to move our start to Monday the 16th. Price and plan stay the same. If you’d rather pick an in-stock vanity, I can send two options and keep Monday. Which do you prefer?”
Alex chooses to wait. Jordan texts again on the 12th when tracking shows the vanity has shipped, and confirms the start. The job starts two weeks late, but Alex never had to chase anyone — and later sends Jordan a referral.
When a client does that, a short thank-you closes the loop; the referral thank you notes page has wording for it and for asking.
New start date
The core message: the start moves, here is the new date or when you’ll have one.
New start date
One clear replacement day.
Hi Alex — I need to push our start date. I can begin Monday the 12th instead of this Thursday. Sorry for the change — does Monday still work for you?
Two new windows
Let them choose.
Hi Jordan — I have to move the project start. I can open Tue morning or Fri afternoon next week. Which is better on your end?
Still committed
They may think you bailed.
Quick update: start is delayed a few days on my side, but the job is still on. I’ll confirm the new first day by tomorrow so you’re not left guessing.
Price and plan unchanged
Answer the worry before they ask.
Hi Alex — our start is moving from the 5th to the 9th. Nothing else changes: same price, same plan, same crew. Sorry for the shuffle.
New date not set yet
Honest when you can’t name a day.
Hi Jordan — I won’t be able to start on Monday as planned. I don’t have a firm new date yet, but I’ll text you by Thursday with one. Your job stays next in line.
Delays by reason
One line of why, then the new date. Pick the reason that’s actually true.
Materials / supplier delay
Not your preference; still your update.
Hi — our start is delayed: materials won’t be ready until next week. Earliest I can begin is Wed. I’ll hold that day for you unless you want a later slot.
Permit or inspection
When the city controls the date.
Hi Alex — the permit hasn’t been approved yet, so I can’t legally start on the 3rd. As soon as it comes through, I’ll text you the first day I can begin. No action needed from you right now.
Earlier job ran over
Own it without oversharing.
Hi Jordan — the job before yours took longer than planned, so I need to start yours two days later, on Wednesday instead of Monday. That’s on me, and I’m sorry for the change.
Weather on outdoor work
The forecast decides.
Hi Alex — the forecast shows rain all of Tuesday and Wednesday, and I can’t pour or paint outside in it. I’d like to start Thursday instead. I’ll confirm Wednesday evening once I see the updated forecast.
Illness or injury
Short and private.
Hi Jordan — I’m sick and won’t be able to start tomorrow. I expect to be back by Monday and will confirm on Saturday. Sorry for the late notice.
Helper or sub unavailable
Someone else’s schedule moved.
Hi Alex — the electrician I work with can’t make Thursday, and I need him for the first day. I can start Monday the 16th instead. Want me to lock that in?
Parts ordered — waiting on parts or materials mid-job
The job is partly done and paused for a part. Say what you ordered, the ETA only if you have one, and what happens next.
Ordered with ETA
You have a supplier date. Share it once.
Hi Alex — I ordered the part we need. Supplier says it should arrive by Friday. I’ll text you as soon as it’s here so we can finish the job.
Ordered, no firm date
Lead time is fuzzy. Don’t invent a day.
Hi — parts are ordered. I don’t have a firm delivery day yet. I’ll update you when the tracking shows it’s on the way, then we’ll set a time to wrap up.
Job paused until parts land
They’re wondering if you’re still coming.
Hi Jordan — we’re paused until the replacement part arrives. Everything else is set; I just can’t finish without it. I’ll book the return visit as soon as it shows up.
Special-order part
Longer wait; set expectations.
Quick update: the part is a special order, so it may take a bit longer than a stock item. I’ll keep you posted and won’t show up until we have it in hand.
Parts in — next step
Arrival ping; offer finish times.
Good news — the parts arrived. I can finish Tue afternoon or Wed morning. Which works better for you?
Safe to use in the meantime?
Tell them what works while they wait.
Hi Alex — while we wait on the part, the sink is safe to use, but please don’t run the dishwasher until I’m back. I’ve shut off its supply valve under the sink just in case.
Parts ordered, backordered & arrived
From the order to the install: confirm, collect for special orders, flag backorders, and book the install the day parts land.
Parts ordered — confirmation before the job
The client approved the repair; you ordered the parts.
Hi Alex — thanks for the go-ahead. I’ve ordered the parts for your repair (order #[number]). The supplier estimates delivery by Wednesday. Once they’re in, I’ll text you to book the install.
Parts ordered — deposit for special-order parts
Expensive or non-returnable parts: ask before you order.
Hi Jordan — the replacement motor is a special-order part and isn’t returnable, so I collect the parts cost up front: $286. Once that’s paid here [link], I’ll place the order today and send you the tracking.
Parts on backorder
The supplier pushed the date. Offer a choice if there is one.
Quick update, Alex: the part we ordered is backordered until about Dec 2. I can wait for the same brand, or get a compatible one by Friday for $15 more. Your call — both come with the same warranty from me.
Parts arrived — schedule the install
Close the loop the same day the box shows up.
Hi Jordan — your parts arrived today. Thanks for waiting! I can install Thursday 1–3pm or Friday 9–11am. The visit takes about an hour.
A second delay or an ongoing wait
When a delay gets longer, update early and give them choices.
Second delay
Say it plainly; don’t pretend it’s the first.
Hi Jordan — I’m sorry, I have to push the start again. The supplier moved the delivery to the 20th. I know this is the second change. I’ll start the day after it arrives, and I’ll text you the moment it ships.
Weekly no-news update
So silence doesn’t do the talking.
Hi Alex — quick weekly update: the part is still on backorder, no new date yet. I’m checking every few days and will tell you the minute I hear. Nothing needed from you.
Offer an alternative
When the wait is getting long.
Hi Jordan — the backorder on that fixture is now about four weeks. If you’d rather not wait, I can send two in-stock options that fit the same space and finish next week. Totally your call.
Offer to step back
If they’d rather not wait at all.
Hi Alex — I understand if this delay doesn’t work for you. If you’d like to go with someone who can start sooner, I’ll refund your deposit in full — no hard feelings. If you’d rather wait, I’ll keep your spot.
When the delay is on the client’s side
They need more time. Confirm it kindly and say how long you can hold the date.
Client-side delay acknowledged
They asked to wait; you confirm.
Got it — we’ll delay the start until you’re ready. Text me when the space is clear and I’ll give you the next two open days.
Their choice isn’t decided yet
Waiting on their selection, kindly.
Hi Jordan — I can’t order the cabinets until we have the final color, so the start will move until we do. Once you pick, it takes about a week to arrive. Happy to send the samples again.
Space not ready
The room or site isn’t clear.
Hi Alex — no problem about the room not being cleared yet. I’ll move your start to next Tuesday. If it’s ready sooner, text me and I’ll see if I can come earlier.
Holding the slot for a limited time
Be clear about how long you can wait.
Hi Jordan — happy to wait until you’re ready. I can hold your start week until the 30th; after that I’d need to give it to the next job and find you a new date.
Project delay emails and a delay letter
For contracts, larger jobs, or clients who prefer email.
Project delay letter to a client
Formal version for larger jobs, contracts, or a paper trail.
Subject: Update on your project start date
Dear Alex,
I’m writing to let you know that the start date for your [project] at [address] needs to move.
Original start date: [date]
New start date: [date]
Reason: [one line, e.g. “the permit approval is taking longer than expected”]
The scope of work and price in our agreement stay the same. [If anything does change, say so here and ask for approval.]
I’m sorry for the inconvenience. I will confirm the new date again two days before we begin, and I’ll contact you right away if anything else changes.
If the new date doesn’t work for you, please reply and we’ll find one that does.
Sincerely,
[Your name]
[Business name] · [phone]
Waiting on parts email
Mid-job, when the wait is more than a few days.
Subject: Your repair: waiting on a part
Hi Jordan,
Quick update on the [repair]. I’ve ordered the [part]. The supplier’s current estimate is [date / “not confirmed yet”].
What this means for you:
- [What’s safe to use, or what to avoid, until it’s fixed]
- No extra charge for the return visit.
- I’ll contact you as soon as it arrives to set a time to finish.
Thanks for your patience,
[Your name]
Second delay email
When the first new date slips too.
Subject: Another change to your start date — I’m sorry
Hi Alex,
I’m sorry to send another change. The [materials/permit/part] has been delayed again, and the earliest I can now start is [date].
I know this is frustrating. You have three options:
1. Keep your spot and start on [date].
2. Choose [alternative] so we can start [earlier date].
3. Cancel, and I’ll refund your deposit in full.
Let me know what you prefer. Whatever you choose, I’ll keep you updated at least once a week until we start.
[Your name]
Delay messages by trade
The same idea — what moved, the new date, what stays the same — for different kinds of work.
Contractor or remodeler
Bigger jobs, longer lead times.
Hi Alex — the windows for your job are now arriving the week of the 9th instead of the 2nd, so I’ll start on the 10th. Same price, same scope. I’ll confirm on the 8th once they’re delivered.
Plumber or appliance repair
Part on order between visits.
Hi Jordan — the control board for your dryer is on order and should arrive in 3–5 business days. I’ll call to book the install as soon as it’s in. No extra trip charge.
Landscaper or painter
Weather and season.
Hi Alex — the ground is still too wet to start the patio. I’m moving us to next Monday and will check conditions again Friday. I’ll let you know either way.
Tutor, trainer, or coach
A program start that moves.
Hi Jordan — I need to move our first session from the 4th to the 11th. Same time, same plan, and the full number of sessions. Sorry for the change.
More delay situations
The utility company, holiday shipping, a change the client asked for, and starting part of the job.
Waiting on the utility company
When the start depends on a power, gas, or water appointment you can’t control.
Hi Alex, the panel upgrade is ready to go, but the power company has to disconnect service first, and their earliest date is Nov 19. I’ll start that same morning. I’ll call them every few days in case a cancellation opens up sooner.
Holiday shipping delays
Set expectations early in November.
Heads-up for your project: suppliers are warning that holiday shipping may add 1–2 weeks to deliveries through December. Your fixtures are ordered and should arrive by Dec 4, so I’ve planned the install for Dec 8–9. I’ll confirm once they ship.
Delay because of a change they asked for
Neutral, with the new date and any cost.
No problem changing to the larger window, Jordan. It’s a special order, so it pushes the install from Nov 12 to about Dec 1. The price difference is +$210. I’ll send a change order to approve. Everything else stays on schedule.
We can start part of the job now
Keep things moving while one piece waits.
Good news: while we wait on the countertop, I can start the cabinets and plumbing rough-in on Monday as planned. That way the only thing left when the countertop arrives is about one day of install and hookup.
How to write a revised project timeline clients will trust
A delay message only calms a client if the new date looks believable. A new date with nothing behind it reads as a guess. A short revised timeline shows the steps that lead to the date:
List what’s waiting on what. “Cabinets ship Mon Nov 16 → install Nov 18–19 → countertop template Nov 20 → counters Dec 4 → plumbing hookup Dec 7.” Clients accept a later date when they can see the chain.
Mark which steps are confirmed and which are estimates. Use “confirmed” for anything with a tracking number or a booked inspection, and “estimate” for the rest.
Add a buffer, and say so. “I’ve added two working days of cushion before the finish date.” Finishing a day early beats a third delay.
Name the next check-in date. “I’ll update you Friday either way.” Then do it, even if there’s no news.
Put it in writing. If your contract has a completion date, send the revised date by email, and ask the client to reply to confirm. Keep it with your change order records.
Worked example: a kitchen remodel was due to finish Fri Dec 4, but the cabinets are backordered until Mon Nov 16. Instead of texting “cabinets are late, maybe mid-December,” the contractor emails a five-line timeline: cabinets Nov 16 (confirmed, tracking attached), install Nov 18–19, countertop template Nov 20, counters Dec 4 (estimate), hookup and final walkthrough Fri Dec 11. The client replies “Thanks, that’s clear. Can we still have the sink working for Christmas?” The answer is yes, with two weeks to spare.
Making up for a delay: credits, discounts and cancellations
What to say when the delay is on you and the client is frustrated, or wants out.
Apology with a small credit
When the delay was your fault.
Hi [Name], I’m sorry. The delay on your [project] is on us, not you. To make up for it, we’re taking [$150 / 5%] off the final invoice. The new finish date is [Fri, Dec 11], and I’ll update you every Friday until we’re done.
Client asks for a discount because of the delay
Fair, without caving on everything.
I understand. You planned around the original date, and that matters. The [supplier backorder] was outside our control, but I don’t want you to carry all of it. I can [waive the trip charge for the extra visit / take $100 off]. Does that feel fair to you?
Client wants to cancel because of the delay
Respect it, offer a choice.
I understand, and I’m sorry it came to this. Here are your options: 1) we finish on the revised date of [Dec 11] with [the credit we discussed], or 2) we stop here and I refund the unused part of your deposit, [$X], within [5 business days] and send an itemized list of what’s been done. Just let me know which you prefer.
Refund of deposit after a long delay
Clean and documented.
As discussed, we’ve canceled the remaining work on your [project]. We’ve refunded [$X] of your [$Y] deposit to your [card ending 1234]. The other [$Z] covered [special-order materials already delivered to you / labor completed on Nov 9]. A receipt is attached. Thank you for your understanding, and I’m sorry we couldn’t finish on time.
Thank you for waiting (when the job finally finishes)
Close the loop warmly.
Your [project] is finished! Thank you for your patience through the [cabinet backorder]. I know it wasn’t the timeline we planned. The [$150 credit] is on your final invoice, attached. It was a pleasure working with you.
Delay you saw coming (warn early)
Before it’s a problem.
Quick heads-up, [Name]: our supplier just warned that [tile] orders placed this month may ship late because of the holidays. Your job is still on for [Mon Jan 11], but if you’d like extra certainty, we can [order the backup option today]. Want me to?
Project schedule update templates
Regular updates stop the “any news?” texts and show the project is still moving.
Weekly project update (email)
Same format every week.
Subject: [Project] update — week of [Nov 16]
Done this week: [cabinets delivered and installed]
Next week: [countertop template Fri Nov 20]
Waiting on: [counters, est. Dec 4]
Finish date: [Fri, Dec 11] (unchanged)
Anything we need from you: [pick the faucet by Wed]
Thanks,
[Name]
Revised completion date (formal email)
For projects with a contract date.
Subject: Revised completion date — [project address]
Hello [Name],
Because of [a manufacturer backorder on the cabinets], the completion date in our agreement dated [Oct 5, 2026] changes from [Friday, December 4, 2026] to [Friday, December 11, 2026]. The price and scope are unchanged. Please reply to confirm you’ve received this.
Thank you,
[Name], [Company]
Notice of delay under the contract
When your agreement has a delay clause.
Per section [7] of our agreement, this is written notice of a delay caused by [the city inspection rescheduled from Nov 12 to Nov 19]. We expect the delay to add [5 working days]. We will send a revised schedule by [Nov 20].
Short text update, no change
Keeps trust between big updates.
Quick update on your [deck]: everything is on track for [Thursday]. No action needed from you. I’ll text the morning we start.
Inspection passed — next step
Momentum message.
Good news: the [framing] inspection passed this morning! Drywall starts [Monday, Nov 16], and we’re still on track for [Dec 11].
Delay is over — back on schedule
Celebrate the fix.
The [parts] arrived today, so we’re back on the original schedule. We start [tomorrow at 8am]. Thanks for hanging in there with us!
Tell the truth about the new date — once, with a buffer
Parts delays multiply when you promise “tomorrow” out of guilt. Give a date you can beat 80% of the time, explain the dependency, and update only when the date changes.
Name the dependency (part ETA, permit, weather, prior trade).
Give a window, not a minute (“week of Nov 16”).
Update the same day you learn of a slip — silence is worse than bad news.
Worked example: an HVAC tech promised “Friday for sure” three times on a motor order and ate a [$150] goodwill discount plus a bad review. After “supplier ETA Nov 17; I’ll install within 1 business day of arrival and text the same morning,” reviews stabilized and discounts for delay dropped to near zero.
Parts on backorder? New date and delay message builder
Enter the original date, the supplier’s ETA for the part, how many work days you need after delivery, and how much cushion to add. The builder works out the date to promise the client, how many days the job slips, when to send a check-in, and writes the parts-ordered delay text and the check-in text.
Your new date and delay messages
Supplier ETA for the vanity: Fri, Dec 11 (estimate until there's tracking)
Earliest you can do the work: Mon, Dec 14 (1 work day after delivery)
Date to promise the client: Wed, Dec 16 (with 2 work days of cushion)
That is 16 calendar days later than the original Mon, Nov 30.
Check-in to send either way: Thu, Dec 10 (the work day before the ETA)
Text now: Hi Alex, the vanity for your bathroom start is on backorder; the supplier now says it arrives around Fri, Dec 11. So I'm moving your bathroom start from Mon, Nov 30 to Wed, Dec 16, which leaves a little cushion in case the shipment slips. Price and plan stay the same. I'll update you on Thu, Dec 10 either way. If you'd rather not wait, I can look for an in-stock alternative; just say the word. – Jordan
Check-in on Thu, Dec 10: Hi Alex, quick update on the vanity: [it has shipped, tracking says Fri, Dec 11 / still no ship date from the supplier]. We're [still on for Wed, Dec 16 / looking at a new date, and I'll call you today]. – Jordan
Worked example (the default numbers): a bathroom was to start Monday, Nov 30, 2026, and the vanity is now due Friday, Dec 11. With one work day after delivery, the earliest start is Monday, Dec 14; two work days of cushion make the promised date Wednesday, Dec 16, which is 16 calendar days later than planned. The check-in goes out Thursday, Dec 10, the work day before the ETA, whether or not there is news.
The cushion follows the advice in tell the truth about the new date once: promise a date you can beat, not the earliest possible one. The builder skips Sundays, and Saturdays too if you work Monday to Friday, but not holidays, so move the date yourself if it lands on one.
Delay update texts
Dependency + new window.
Part delayed
New ETA.
Hi [Alex], supplier pushed the [blower motor] to [Mon, Nov 16]. I’ll install within one business day of arrival and text that morning. Sorry for the wait — diagnosis fee stays as paid; no extra labor for the return.
Prior trade holding you
Honest.
Hi [Jordan], we can’t start until [electrical rough-in] is signed off. Latest from them is [Thu]. I’ll confirm your start the day that’s done.
We’re clear to start
Good news.
Part arrived today. I can install [Tue 1–3] or [Wed morning] — which works?
Make-goods when the delay hurt them
Proportionate.
Small credit
Gesture.
Thanks for your patience on the delay. I’m applying a [$50] credit on the final invoice.
No charge return visit
Labor.
Because the part slipped twice, the return visit labor is on me — you only pay the part difference if any.
Offer cancel + refund deposit
Exit ramp.
If the new timing doesn’t work, I can refund your [$200] deposit in full and release the job — no hard feelings. Or we keep the [Nov 16] window.
Start-delayed messages in Spanish
New ETA.
Pieza retrasada
Part delay.
Hola [Alex], el proveedor atrasó el [motor] al [lunes 16 de noviembre]. Instalo al día hábil siguiente y le aviso esa mañana.
Ya llegó
Arrived.
La pieza llegó. ¿Prefiere instalación el [martes 1–3] o el [miércoles] por la mañana?
Las piezas se retrasaron
Diga la nueva fecha y pregunte.
Hola [nombre]: las piezas llegan el [viernes 20]. Le reservé la instalación para el [lunes 23]. ¿Le parece bien, o prefiere que pausemos el trabajo hasta nuevo aviso?
Ya llegaron las piezas
Proponga una cita.
Hola [nombre]: ya llegaron las piezas. ¿Le confirmo la instalación el [miércoles 25, de 9 a 12]?
Give the new date the moment you know — silence is the complaint
Parts delays are forgivable; radio silence is not. New ETA + choice beats weekly maybes.
New date or date range.
What is waiting on.
Option to cancel/pause.
Worked example: shops that texted supplier ETAs weekly kept more jobs than those who went quiet.
Delay-with-date texts
Give a real date every time the schedule moves.
Parts delayed: new date with the install held
Give the new arrival date and keep their slot.
Hi [Name], the supplier now says the parts for your [job] arrive [Friday, November 20]. I'm holding your install for [Monday, November 23]. Does that still work, or would you rather pause until they're actually here?
Second delay from the supplier
Apologize once and ask whether to keep the hold.
Hi [Name], I'm sorry - the supplier pushed the delivery again, now to [Tuesday, November 24]. I know this is frustrating. Do you still want me to hold the next open install date for you, or would you prefer to reschedule once the parts are in hand?
Parts arrived: lock in the date
Good news, with a specific time to confirm.
Good news, [Name] - the parts are here. I can lock in your install for [Wednesday, November 25, 9-12]. Reply YES to confirm, or tell me a time that works better.
Choices during a delay
Let the client choose: wait, cancel, or take a temporary fix.
Offer to cancel with a full deposit refund
For clients who can no longer wait.
Hi [Name], if the wait is too long for you, I completely understand. We can cancel the job and refund your full deposit of $[amount] within [5 business days]. Just let me know which you'd prefer.
Offer a temporary fix until parts arrive
When a stopgap is safe and possible.
Hi [Name], while we wait for the parts, I can [install a temporary (loaner / patch)] so you're not without [heat / water / a working door] in the meantime. It's [no charge / $amount]. Want me to set that up?
Promise first slot when parts clear
Reassure them they will not lose their place.
Hi [Name], one promise while we wait: the day your parts clear, you're the first job on the schedule. I'll text you as soon as I have a delivery date.
Project delay messages: quick answers
How do I tell a client their project start is delayed? As soon as you know: what changed, the new date (with a little buffer), what it means for them, and what you’re doing about it. One clear message beats several vague updates.
Should I give a new date if I’m not sure? Give the date you’re confident in, not the best case, and say what it depends on: “We’re now planning on Mon, Dec 14, once the vanity arrives; the supplier confirmed Dec 10.” A second delay hurts trust far more than a later first date.
Should I offer a discount for a delay? Not automatically. Offer something when the delay was on your side and cost the client real time or money: a credit, a free add-on, or the option to cancel without penalty. The make-good section covers each.
What if the delay is the client’s fault? Explain plainly what you need from them and the new date that follows, without blame: “Once the tile is picked by Friday, we can start the 14th.”
Call or text the day you find out, then put the new date in writing
Text or call the same day you learn about the delay, then send the message so the new date is in writing. For a larger job with a written agreement, follow up with the email letter version.
Put a reminder in your own calendar to update them before the next promised check-in — even if there’s no news. Once the work starts, a short “thanks for waiting” goes a long way; see Thank you for your patience.